2000kVA Emergency Generator Install

Due to a fault in the HV network of a food factory in Northern Ireland, JJ Loughran was asked to source and install a 2000kVA backup generator to get the factory up and running for the following day.

By 4.00 pm, a network fault on the 11kV/415v transformer was traced and confirmed. A backup generator and fuel storage were sourced and loaded for transport by 8:30 pm. The generator was onsite at the food factory by 12:30 am, and the factory was operational and running on the generator by 4:00 am, just in time for factory production to start at 06:00 am, and 150 staff were able to work.

jjloughran.com

×

Codes of Practice 2025

IMPORTANT:

The AEMT Codes of Pracice are being replaced with our provisional codes of practice at the end of 2025. Members will be asked to demonstrate compliance with these codes by 2027. The Secretariat and Council are preparing for this transition, ensuring members have the support, resources and tools needed to comply.